Wrong side of the tracks: the tar sands-by-rail pipe dream
Our latest report presents new analysis that confirms that shipping tar sands bitumen by rail cannot possibly meet the tar sands industry’s reckless production growth plans. The report’s conclusions demonstrate that the U.S. Department of State’s analysis of rail’s ability to replace the Keystone XL pipeline failed to consider key data and evidence and drew conclusions that are both misleading and dangerous for the American public.
When the State Department issued its final environmental impact report on the Keystone XL pipeline back in February of this year, one of the key elements driving its conclusion that “the proposed Project is unlikely to significantly affect the rate of extraction in oil sands areas” was the idea that the North American rail system would pick up the slack.
Oil Change International released a report today that firmly concludes that it can’t and it won’t.
We found that for much of 2014, shipping tar sands by rail to the Gulf Coast (the intended destination of Keystone XL) has been losing money and the economics are unlikely to change any time soon.
Some rail shipments continue to make the 3,000 mile journey due to contractual obligations but these shipments averaged less than 6 percent of the capacity of Keystone XL in the first five months of 2014, a mere 47,000 barrels per day. Total tar sands rail imports into the U.S. are around 3 percent of the projected transportation need to 2030. And this is during a period in which the capacity to load and unload bitumen from trains grew significantly.
The idea that rail can profitably deliver the roughly 4 million bpd capacity of currently proposed pipelines is so far-fetched, that even those moving bitumen by rail do not believe it. When Steve Hanlon, President and CEO of Gibson Energy Inc., said “Crude by rail is not a panacea. It’s not going to replace pipe.” he was right. And he should know, his company operates several crude-by-rail terminals including one that loads tar sands bitumen onto trains in Alberta.
Just a glance at the chart below is enough to recognize that the gap between today’s transportation capacity and forecast Canadian oil production is unbridgeable by rail. Considering that tar sands producers want to recklessly grow production beyond this forecast it is abundantly clear that every pipeline counts toward the goal of either achieving or thwarting that growth.
So what’s the problem? Surely all the tar sands producers need to do is buy more tank cars and install more loading capacity and they can run trains full of tar sands to every refinery and port in the union.
The problem is cost. The tar sands industry is already sailing close to the wind with some of the highest costs in the oil industry while producing the lowest quality crude oil that sells at substantial discounts to other crude oils. This combination of high costs and poor returns is working against bitumen-by-rail being much more than a niche activity.
The headwinds facing the bitumen-by-rail trade can be summarized as follows:
Large-scale terminals need to be supplied by pipeline to be able to access the quantity of crude they need to load multiple unit trains per day. This means they are supplied with diluted bitumen (dilbit) rather than the raw bitumen that would save producers the cost of shipping diluent making rail cost-competitive with pipelines. Removing diluent is an option but so far no unit train terminal has the equipment and the economics of diluent recovery are unproven.
Gulf Coast crude oil prices are being suppressed by the flood of crude from fracked oil fields across America. Prices for tar sands crude on the Gulf Coast do not cover the additional cost of shipping dilbit 3,000 miles by rail.
Rail is an above ground mode of transport that is vulnerable to weather and other unpredictable delays. Tar sands producers must compete for access to capacity with oil producers in North Dakota as well as shippers of commodities such as grain, coal and manufactured and imported goods. Unlike pipelines, price and service is not locked into decade long contracts and is vulnerable to inflation and disruption.
The reduced profitability of shipping bitumen by rail means that tar sands producers are less able to grow their production capacity because they cannot profitably deliver bitumen to distant markets.
While the transport of tar sands bitumen by rail may grow to accommodate near-term production growth plans, perhaps tripling from today’s level in the next two years, it is abundantly clear that it cannot replace 4 million bpd of pipeline capacity.
Therefore, stopping pipelines, stops tar sands growth.
And this is a point overlooked by those that say that blocking pipeline development will simply lead to more tar sands crude on the rails. The opposition to tar sands pipelines is about much more than the pipelines themselves. At the core of the anti-pipeline campaigns is opposition to the tar sands expansion that pipelines – such as Keystone XL – will unlock. Proposed rail terminals that aim to unload tar sands crude on the west and east coasts face organized opposition and are far from assured to go ahead.
The debate around pipeline versus rail is a red herring. The real choice that we are faced with is between climate damage resulting from the status quo and a modern, low-carbon energy future that can ensure a safe climate and environment for generations to come. One of the first steps towards that future is to stop extracting more tar sands crude that climate science clearly indicates we cannot afford to burn.