Skip to content
Oil Change International | Data Driven, People Powered. Oil Change International | Data Driven, People Powered.
  • About
    • Our Work
    • Values
    • Team
    • Jobs at OCI
    • Ways to Give
  • Program Areas
    • Africa
    • Asia
    • North Sea
    • United States
    • Global Industry
    • Global Public Finance
    • Global Policy
  • Blog
  • Press Releases
  • Publications
Donate
  • Get Updates
    • Share on Bluesky Share on Bluesky Bluesky (opens in a new window)
    • Share on Twitter Share on Twitter Twitter (opens in a new window)
    • Share on Instagram Share on Instagram Instagram (opens in a new window)
    • Share on LinkedIn Share on LinkedIn LinkedIn (opens in a new window)
    • Share on Facebook Share on Facebook Facebook (opens in a new window)
Donate
  • About
    • Our Work
    • Values
    • Team
    • Jobs at OCI
    • Ways to Give
  • Program Areas
    • Africa
    • Asia
    • North Sea
    • United States
    • Global Industry
    • Global Public Finance
    • Global Policy
  • Blog
  • Press Releases
  • Publications
    • Get Updates
    • Share on Bluesky Bluesky
    • Share on Twitter Twitter
    • Share on Instagram Instagram
    • Share on LinkedIn LinkedIn
    • Share on Facebook Facebook
Go to OCI Homepage
Published: June 25, 2007

Gazprom and Eni Propose €10bn Pipeline

  • Latest from OCI
  • Blogs listing
  • Gazprom and Eni Propose €10bn Pipeline
    • Blog Post extreme energy gas pipelines Russia

The Russian state-controlled gas company, Gazprom and Italian energy group, ENI, are proposing a €10bn-plus pipeline to bring Russian gas to Europe in a move that will reignite concerns about the European Union’s dependence on Russian supplies.

With the backing of both Russian and Italian governments, the companies signed a memorandum of understanding at the weekend to begin a feasibility study for the pipeline.

The study, which will look at the political implications of the project, as well as its technical and economic viability, is expected to take about 18 months, with the pipeline taking three years to build.

The pipeline could be 3,200km long. Known as South Stream, it would run from southern Russia 900km under the Black Sea to Bulgaria. From there it could take either, or both, of two routes: 1,000km to Greece, from where the gas could go on to Italy or 1,300km north into central Europe.

The irony is that EU leaders keep being warned about over reliance on Russian gas at the same time as continuing to get more reliant on it.


Oil Change International | Data Driven, People Powered.
Donate Get Updates
Back to the top
  • Keep in touch

  • Oil Change International
    714 G St. SE, #202
    Washington, DC 20003
    United States

    +1.202.518.9029

    [email protected]

    • Share on Bluesky Bluesky (opens in a new window)
    • Share on Twitter Twitter (opens in a new window)
    • Share on Instagram Instagram (opens in a new window)
    • Share on LinkedIn LinkedIn (opens in a new window)
    • Share on Facebook Facebook (opens in a new window)
  • Quick links

  • About OCI
  • Our Values
  • Jobs at OCI
  • Ways to Give
  • Media Centre

  • Publications
  • Press
  • Associated websites

  • Big Oil Reality Check
  • Energy Finance Database
  • Permian Climate Bomb
  • Site map
  • Privacy policy

Copyright © 2025 Oil Change International. Web design by Fat Beehive