Skip to content
Oil Change International | Data Driven, People Powered. Oil Change International | Data Driven, People Powered.
  • About
    • Our Work
    • Values
    • Team
    • Jobs at OCI
    • Ways to Give
  • Program Areas
    • Africa
    • Asia
    • North Sea
    • United States
    • Global Industry
    • Global Public Finance
    • Global Policy
  • Blog
  • Press Releases
  • Publications
Donate
  • Get Updates
    • Share on Bluesky Share on Bluesky Bluesky (opens in a new window)
    • Share on Twitter Share on Twitter Twitter (opens in a new window)
    • Share on Instagram Share on Instagram Instagram (opens in a new window)
    • Share on LinkedIn Share on LinkedIn LinkedIn (opens in a new window)
    • Share on Facebook Share on Facebook Facebook (opens in a new window)
Donate
  • About
    • Our Work
    • Values
    • Team
    • Jobs at OCI
    • Ways to Give
  • Program Areas
    • Africa
    • Asia
    • North Sea
    • United States
    • Global Industry
    • Global Public Finance
    • Global Policy
  • Blog
  • Press Releases
  • Publications
    • Get Updates
    • Share on Bluesky Bluesky
    • Share on Twitter Twitter
    • Share on Instagram Instagram
    • Share on LinkedIn LinkedIn
    • Share on Facebook Facebook
Go to OCI Homepage
Current Affairs
Published: March 23, 2017

#NoKXL Best Hits: Six Reasons Keystone XL Must Not Be Built

As we await the photo-op of Keystone XL approval from the Trump Administration, here’s a compilation of a few of our “best hits” for why Keystone XL must not be built.

  • Latest from OCI
  • Blogs listing
  • #NoKXL Best Hits: Six Reasons Keystone XL Must Not Be Built
    • Blog Post climate Current Affairs Featured Keystone XL KXL News nokxl oil by rail petcoke tar sands Trump
David Turnbull

david@priceofoil.org

Rumors have been swirling today that the Trump Administration will be officially approving the federal permit for the newly-reapplied for Keystone XL pipeline as early as Friday. We have worked for years to stop this pipeline from being built, and we were successful in convincing the previous administration that Keystone XL would be a disaster.

The approval by the Trump Administration is a set back, to be sure, but there are numerous roadblocks still standing in the way of the pipeline being built. There is still no approved route in Nebraska and the #NoKXL movement in Nebraska is working to keep it that way. So as we await the photo-op from the Trump Administration, here’s a compilation of a few of our “best hits” for why Keystone XL must not be built. (Note that while not everything has changed since these reports were released, the oil market is of course constantly in flux — making it all the more concerning that Keystone XL may be pushed through by the Trump administration without a new and robust analysis of its potential impacts in light of current market conditions and an ever-more-dire understanding of our climate crisis.)

Keystone XL fails the climate test.

This one’s a no brainer and reinforced by a lot of our work. Keystone XL would transport hundreds of thousands of barrels of some of the most carbon-intensive oil in the planet each day. It would incentivize further expansion of the tar sands in Canada — a huge and growing source of emissions for Canada, and the oil Keystone XL would transport would contribute some 181 million metric tons of CO2e each year if built.

Read more in our two groundbreaking reports:

Cooking the Books: The True Climate Impact of Keystone XL
FAIL: How the Keystone XL Tar Sands Pipeline Flunks the Climate Test

Even the State Department’s own faulty review of the Keystone XL pipeline (written by a consultancy affiliated with the oil industry) showed that under a scenario in which climate change is taken seriously, the emissions associated with the Keystone XL pipeline would be the equivalent of adding 5.7 million cars to the roads each year. And the Environmental Protection Agency, in comments in response to State Department’s analysis, highlighted the potential greenhouse gas emissions as a reason for rejecting the pipeline.

Keystone XL is an export pipeline.

A constant talking point of the industry and it’s friends in Congress (and now the White House) is that Keystone XL will contribute to energy security for the United States. Putting aside that we can’t drill our way to energy security in the first place because the climate impacts are a major security threat, we also exposed that Keystone XL is, in fact, an export pipeline. When Keystone XL was being debated around 2013 and 2014, the crude oil export ban in the United States was still in place, but even so the industry was exposed to be planning to exploit a loophole in the regulations in order to export the tar sands crude oil into the global market from U.S. ports along the Gulf Coast. Even the oil refined in the Gulf Coast would largely be bound for exports, based on a review of exports from refineries that would accept oil from Keystone XL, building on our earlier analysis. Keystone XL was clearly shown to be a pipeline through the United States and not to the United States.

Rail is no replacement for Keystone XL, and the choice is a false one.

As the industry fears of a Keystone XL rejection started to ramp up, they began putting out a false choice narrative that if Keystone XL was not built, they would just transport the tar sands via rail, which would be more dangerous. Turns out this simply was never an economically viable option. Government data from the Energy Information Administration showed that very little Canadian crude of any kind was getting to the Gulf Coast via rail. What’s more, we worked to expose this option as a false choice in the first place — after all, choosing to be hit by a car or a truck is a choice no one ever wants to make.

Keystone XL supporters in Congress are bought and paid for by the fossil fuel industry.

During President Obama’s tenure, Congress made multiple attempts to take decision-making authority out of his hands to force approval of Keystone XL. Votes were cast on numerous occasions and each time the message was loud and clear: the oil industry was paying for support for Keystone XL. The American Petroleum Institute spent millions lobbying for Keystone XL. Members of Congress voting to force approval of the pipeline took millions from the fossil fuel industry, many times more than those opposed to the project. It became crystal clear that pushing for approval of the Keystone XL pipeline was not about jobs or economic development, it was about politicians paying back their oily campaign boosters. Plain and simple.

The hidden costs of Keystone XL are massive.

As the analysis of Keystone XL continued, more and more problems emerged. Petcoke — a term new to many — all of a sudden hit the front page of the New York Times, as massive piles of it started piling up in places like Chicago and Detroit. Petcoke is a dirty coal-like byproduct of the refining process for heavy oils like the tar sands, and it turned out that it was being ignored in government analysis of the Keystone XL pipelined. Our research found that in Keystone XL’s projected lifetime, the pipeline would be responsible for enough petcoke to fill 80 Empire State Buildings. When burned in power plants, petcoke is some 5 to 10 percent dirtier than coal on a per-unit of energy basis, meaning that the petcoke produced from Keystone could fuel 5 coal plants and produce 16.6 million metric tons of CO2 each year.

Stopping Keystone XL is not just a symbolic fight, it’s a real one with real impacts.

After Keystone XL was finally rejected by President Obama, we worked to show that while it was a hugely symbolic show of strength by the massive opposition to the pipeline and movement for climate action, it was also an important substantive victory for our climate as well. Keystone XL could unlock growth of tar sands production if built, and keeping tar sands in the ground is critical to meeting global climate commitments. Fighting against fossil fuel supply is critical, as OCI Executive Director Steve Kretzmann has pointed out forcefully and convincingly. Since then, Oil Change’s “The Sky’s Limit” report has shown that there can be absolutely no new fossil fuel development — and no projects that would incentivize new fossil fuel development such as the Keystone XL pipeline can be approved — if we are to achieve our climate goals.

The movement to stop Keystone XL was massive the first time around. This time around, the stakes are just as high, and the movement will continue to grow. There are simply too many reasons Keystone XL must not be built.

Oil Change International | Data Driven, People Powered.
Donate Get Updates
Back to the top
  • Keep in touch

  • Oil Change International
    714 G St. SE, #202
    Washington, DC 20003
    United States

    +1.202.518.9029

    info@oilchange.org

    • Share on Bluesky Bluesky (opens in a new window)
    • Share on Twitter Twitter (opens in a new window)
    • Share on Instagram Instagram (opens in a new window)
    • Share on LinkedIn LinkedIn (opens in a new window)
    • Share on Facebook Facebook (opens in a new window)
  • Quick links

  • About OCI
  • Our Values
  • Jobs at OCI
  • Ways to Give
  • Media Centre

  • Publications
  • Press
  • Associated websites

  • Big Oil Reality Check
  • Energy Finance Database
  • Permian Climate Bomb
  • Site map
  • Privacy policy

Copyright © 2025 Oil Change International. Web design by Fat Beehive