Skip to content
Oil Change International | Data Driven, People Powered. Oil Change International | Data Driven, People Powered.
  • About
    • Our Work
    • Values
    • Team
    • Jobs at OCI
    • Ways to Give
  • Program Areas
    • Africa
    • Asia
    • North Sea
    • United States
    • Global Industry
    • Global Public Finance
    • Global Policy
  • Blog
  • Press Releases
  • Publications
Donate
  • Get Updates
    • Share on Bluesky Share on Bluesky Bluesky (opens in a new window)
    • Share on Twitter Share on Twitter Twitter (opens in a new window)
    • Share on Instagram Share on Instagram Instagram (opens in a new window)
    • Share on LinkedIn Share on LinkedIn LinkedIn (opens in a new window)
    • Share on Facebook Share on Facebook Facebook (opens in a new window)
Donate
  • About
    • Our Work
    • Values
    • Team
    • Jobs at OCI
    • Ways to Give
  • Program Areas
    • Africa
    • Asia
    • North Sea
    • United States
    • Global Industry
    • Global Public Finance
    • Global Policy
  • Blog
  • Press Releases
  • Publications
    • Get Updates
    • Share on Bluesky Bluesky
    • Share on Twitter Twitter
    • Share on Instagram Instagram
    • Share on LinkedIn LinkedIn
    • Share on Facebook Facebook
Go to OCI Homepage
Current Affairs
Published: September 27, 2007

Iran Warns Total Over Oil Project

  • Latest from OCI
  • Blogs listing
  • Iran Warns Total Over Oil Project
    • Blog Post Current Affairs extreme energy Gas Iran Oil
Andy Rowell

When not blogging for OCI, Andy is a freelance writer and journalist specializing in environmental issues.

[email protected]

Iran has warned France it is prepared to go ahead with a major gas project with Total using Iranian firms alone if the French oil giant gives in to political pressure and does not swiftly implement the deal.
‘I have a message for French President (Nicolas) Sarkozy,’ Caretaker Oil Minister Gholam Hossein Nozari told reporters late yesterday. ‘If Total does not come here, right here, the Pars LNG contracts will be handed over to capable Iranian hands for them to carry out,’ he said.
Under a deal agreed in 2006, Total is slated to exploit the phase 11 of Iran’s giant South Pars gas field to produce liquefied natural gas (LNG) for export and to build a liquefaction plant.
However the final implementation of the deal has been held up by a wrangle over prices, with Iran claiming the French price for the exploitation is too high and Paris saying costs have sky-rocketed since it was agreed.


Oil Change International | Data Driven, People Powered.
Donate Get Updates
Back to the top
  • Keep in touch

  • Oil Change International
    714 G St. SE, #202
    Washington, DC 20003
    United States

    +1.202.518.9029

    [email protected]

    • Share on Bluesky Bluesky (opens in a new window)
    • Share on Twitter Twitter (opens in a new window)
    • Share on Instagram Instagram (opens in a new window)
    • Share on LinkedIn LinkedIn (opens in a new window)
    • Share on Facebook Facebook (opens in a new window)
  • Quick links

  • About OCI
  • Our Values
  • Jobs at OCI
  • Ways to Give
  • Media Centre

  • Publications
  • Press
  • Associated websites

  • Big Oil Reality Check
  • Energy Finance Database
  • Permian Climate Bomb
  • Site map
  • Privacy policy

Copyright © 2025 Oil Change International. Web design by Fat Beehive